English 中文网站 联系我们 欢迎光临Jester valve (tianjin) co., LTD网站!

服务热线 022-29870579

Jester valve (tianjin) co., LTD

Jester valve-Assemble all kinds of valvesAnti-condensation butterfly valve one-stop supply

联系我们
服务热线:022-29870579

电话:18622622771

传真: 022-29870579

网址: tjjstfm.com

邮箱:1710602637@qq.com

地址:天津市蓟县下仓镇邮局东侧

当前位置: 首页 > Industry dynamic > 详细内容
Valve assembly requirements
上传时间:2019-06-11
Clean parts must be sealed for installation.


Requirements for the installation process are as follows:


1. The installation workshop must ensure cleanliness, or set up temporary clean areas, such as newly purchased striped cloth or plastic film, to prevent dust from entering during the installation.


2. Assembly workers must wear clean cotton overalls, pure cotton caps on their heads, no leakage of hair, clean shoes on their feet, plastic gloves on their hands, and degreasing.


3, assembly tools must be degreased before assembly, to ensure clean.
相关标签:
新闻推荐
Jester valve (tianjin) co., LTD 版权所有传真:022-29870579 服务热线: 022-29870579   邮 箱:1710602637@qq.com地址:天津市蓟县下仓镇邮局东侧
津ICP备16000240号-1 Jester valve (tianjin) co., LTD